## From Stopwatches to Computer Vision

For decades, time study has been one of the fundamental responsibilities of an Industrial Engineer.

Armed with a stopwatch, observation sheet, and a good understanding of the process, an engineer follows an operator's work, records individual work elements, measures their duration, and looks for opportunities to improve the process.

It sounds simple, but anyone who has conducted a proper time study knows that the actual work is more complicated.

You need to understand where one work element ends and another begins. You need to distinguish normal working conditions from abnormal situations. You need to observe enough cycles to understand the process rather than simply record a few numbers.

Today, computer vision and edge AI are introducing another possibility.

Instead of relying entirely on manual observation, cameras equipped with computer-vision technology can analyze recorded operations, recognize movements, classify certain work elements, and estimate their durations.

Research has already demonstrated computer-vision-based approaches to automatic motion time studies, including experiments involving manual assembly operations.

This raises an interesting question:

**If a machine can observe and measure work, do we still need an Industrial Engineer with a stopwatch?**

I believe we do. But perhaps the way we use that stopwatch will change.

## 1. What Can AI Actually Measure?

Let's take a simple manual assembly operation.

An operator picks up a component, positions it, installs a fastener, checks the result, and places the finished product on the next conveyor.

A traditional time study might break this operation into several work elements:

Work element (Example duration)

Pick up component ( 1.2 sec )

Position component ( 2.0 sec )

Install fastener ( 3.5 sec )

Visual inspection ( 1.8 sec )

Transfer to next station ( 1.5 sec )

Total: 10.0 sec

With conventional observation, the Industrial Engineer records these durations manually.

With computer vision, the system may be trained to recognize particular movements or activities and estimate how long they take.

The technology offers several potential advantages:

- **More observations:** Recorded operations can be analyzed repeatedly without requiring an engineer to stand beside the workstation throughout the study. - **Consistent timestamps:** Automated detection can help reduce manual timing and recording errors. - **Longer observation periods:** With appropriate camera coverage and processing capacity, operations can be studied across different shifts and production periods. - **Historical comparison:** Repeated recordings can help identify changes in work patterns over time.

Edge AI adds another dimension. Rather than sending every video frame to a remote cloud server, processing can happen closer to the camera, on a local computing device.

This can reduce the need to transmit large amounts of video and may improve response times.

However, there is an important distinction: detecting movement is not necessarily the same as understanding a work element.

A camera might recognize that an operator's hand moved from point A to point B. But does it understand whether the operator was picking up a component, correcting its position, searching for a missing part, or dealing with a defective material?

That distinction matters.

## 2. Where AI Still Needs Human Judgment

Let's consider three situations that frequently happen on a manufacturing shopfloor.

### A. The machine sees the delay, but not its cause

Imagine an operator takes four seconds longer than usual to install a component.

The camera records the additional time.

But what happened?

Perhaps the pneumatic tool has inconsistent pressure. Perhaps the component does not fit properly. Perhaps the material supply is positioned too far away.

Or perhaps the operator is following a different method because the standard work instruction does not reflect the actual process.

AI can help identify the time difference. An Industrial Engineer needs to investigate why it happened.

Without understanding the cause, we risk treating a process problem as an operator performance problem.

### B. Not every movement is waste

Consider an operator who performs a visual inspection before transferring a product.

A computer-vision system might classify the inspection as a separate activity and measure its duration.

But should that time be eliminated?

Not necessarily.

The inspection might be a necessary quality control activity. Alternatively, it might exist because an upstream process is unstable and frequently produces defects.

The engineer must understand the purpose of the activity before deciding whether it is value-added, necessary non-value-added, or an opportunity for improvement.

Simply reducing the duration of every activity is not Lean.

### C. A recorded cycle is not always a representative cycle

Manufacturing operations are rarely identical throughout an entire shift.

There may be:

- Material shortages. - Model changes. - Minor equipment stoppages. - Quality abnormalities. - Different operator experience levels. - Changes in product specifications.

An automated system can collect a large amount of data, but a large sample does not automatically mean a representative sample.

Engineers still need to decide which observations represent normal operating conditions and which should be investigated separately.

This is where Gemba remains important.

**Technology can help us see more. It does not automatically help us understand more.**

## 3. From Cycle-Time Data to Yamazumi: Where the Real Value Begins

Collecting cycle-time data is only the beginning.

The real value of a time study comes when we use the information to improve work distribution.

This is where Yamazumi becomes useful.

A Yamazumi chart visualizes the workload of individual operators or workstations, usually by stacking the durations of their work elements. The chart can then be compared against takt time to identify overloaded and underloaded stations.

Let's use a simplified example.

Assume a production line has a takt time of 30 seconds.

| Operator | Work content | Takt time |

|---|---:|---:|

| Operator 1 | 36 sec | 30 sec |

| Operator 2 | 24 sec | 30 sec |

| Operator 3 | 27 sec | 30 sec |

| Operator 4 | 33 sec | 30 sec |

At first glance, Operator 1 and Operator 4 exceed takt time.

Operator 2 has available capacity.

This gives the Industrial Engineer a starting point for investigating potential workload redistribution.

But the chart alone does not tell us which work elements can be transferred.

We still need to consider:

- Work sequence and process dependencies. - Operator movement and workstation layout. - Equipment availability. - Skill requirements. - Quality control points. - Ergonomic considerations. - Material presentation and replenishment.

A good line balance is not simply about making every bar the same height.

It is about designing a feasible and sustainable distribution of work that supports the required production rate without compromising quality or safety.

This is why the quality of the original time-study data matters so much.

If the work elements are incorrectly identified, the resulting Yamazumi chart may look accurate while representing the wrong process.

## 4. A Practical Approach: Combining AI, Video Observation, and Human Analysis

Rather than treating AI and traditional time studies as competing methods, I believe manufacturers can benefit from combining them.

A practical approach could look like this:

**Step 1 — Define the study objective**

Start with a clear question.

Are we investigating a bottleneck? Checking standard cycle time? Evaluating workload distribution? Preparing for a line-balancing improvement?

Do not install cameras simply because the technology is available.

**Step 2 — Record the actual operation**

Use an appropriate recording method, whether a fixed camera, a mobile device, or another approved video-recording solution.

Make sure the camera captures the relevant work area and that workers understand the purpose of the recording.

**Step 3 — Identify work elements**

Break the operation into meaningful activities.

For example:

- Pick up material. - Position material. - Perform assembly. - Inspect the result. - Transfer the product.

AI may assist with identifying and timing these activities. The Industrial Engineer should verify the classification, particularly where movements overlap or the process contains abnormalities.

**Step 4 — Validate the observations**

Compare automated measurements with actual observations.

Investigate differences rather than automatically accepting the system's output.

Separate normal cycle variations from abnormal conditions, and confirm that the recorded method reflects the approved standard or the improvement opportunity being studied.

**Step 5 — Build the Yamazumi chart**

Organize the work elements by operator or workstation.

Compare total work content against takt time. Identify potential bottlenecks, workload imbalances, and opportunities for improvement.

**Step 6 — Return to the Gemba**

This is perhaps the most important step.

Discuss the findings with the operators and relevant process owners.

Observe the actual conditions. Test possible improvements. Confirm whether the proposed changes are practical.

Then conduct another study to see whether the improvement has produced the expected result.

The purpose of measurement is not to create more data. It is to make better decisions.

## 5. The Other Side of AI Cameras: Shopfloor Privacy

There is another consideration that manufacturers should not overlook.

Installing cameras to analyze work movements is not just a technical decision. It is also a decision that affects the people working on the production line.

Workers may interpret continuous recording as individual surveillance, particularly if the purpose of the system is not clearly explained.

A system originally introduced for process improvement could eventually be used to compare individual productivity or evaluate worker performance.

That creates a different relationship between technology and the workforce.

Before implementing camera-based work measurement, manufacturers should consider:

- Clearly communicating why recording is necessary. - Involving workers and their representatives in the implementation. - Limiting recording to the areas and periods required for the study. - Avoiding unnecessary audio recording and facial recognition. - Defining who can access the footage and how long it will be retained. - Considering whether aggregated process data can achieve the objective without identifying individual workers.

The UK's Information Commissioner's Office provides useful guidance on workplace monitoring, including the importance of transparency, proportionality, and assessing the impact on workers' privacy.

For manufacturers operating internationally, local data protection laws must also be considered.

In Indonesia, this should include the Personal Data Protection Law (UU No. 27 Tahun 2022), where applicable.

Technology should improve the working environment, not make employees feel that every movement is being judged.

## 6. So, Will AI Replace the Stopwatch?

Probably not in the way some people imagine.

AI will likely make certain parts of time-study work faster and more consistent. It may reduce repetitive manual timing, support longer observation periods, and help engineers identify patterns that would otherwise be difficult to notice.

But the Industrial Engineer's responsibility goes beyond measuring seconds.

We need to understand the process, identify abnormal conditions, question existing methods, evaluate work content, and design improvements that make sense in the real production environment.

A camera can record what happened.

A measurement system can calculate how long it took.

A Yamazumi chart can help us visualize the workload.

But deciding what should change, why it should change, and how to implement that change responsibly still requires engineering judgment.

Perhaps the future Industrial Engineer will spend less time holding a stopwatch and more time interpreting data, validating processes, and solving problems.

That would be a meaningful shift.

Not because human observation has become unnecessary, but because technology gives us more opportunities to focus on what humans do best: understanding problems and improving the way work is done.

---

## Turning Work Observations into Better Line-Balancing Decisions

This is also one of the reasons I started developing the **LLeanStore Yamazumi Creator**.

I wanted to make the journey from observing work to visualizing workload a little more practical.

The tool is designed to let engineers review frontline video, record individual work elements and their durations, categorize activities, and generate a Yamazumi chart.

It does not replace the engineer's judgment, nor does it claim to automatically understand every movement in a production process.

Instead, it helps reduce the effort involved in preparing the chart, leaving more room to study the work itself.

Because, at the end of the day, a better chart is useful.

But a better understanding of the process is what creates improvement.

**Explore LLeanStore Yamazumi Creator:** https://www.lleanstore.com/intro/yamazumi

*Built from practical Lean and shopfloor experience, for engineers who want to turn work observations into meaningful improvement.*