Lean & Continuous Improvement · LLeanStore Open Journal

Everyone Works Differently: How to Balance Workload & Stabilize Methods — LLeanStore Journal

By Lia Rahmah · Frontline Continuous Improvement & Industrial Systems · Recent Note

## You Cannot Stabilize a Line When Every Shift Reinvents the Sequence

Observe the same workstation during the morning and night shifts.

One operator prepares several components before starting assembly. Another collects each component as needed. One follows a consistent working sequence, while another makes additional trips to retrieve tools or materials.

Both operators may be doing their best, but their working methods are different.

The result? Cycle times vary, workloads become unpredictable, and production output can fluctuate between shifts.

The natural reaction might be to ask operators to work faster.

But perhaps the more important question is:

**Have we designed a clear and practical method for everyone to follow?**

Standardized Work is not about turning people into machines or forcing everyone to move at exactly the same speed.

It is about establishing the best-known working sequence, considering the time required, available resources, safety, and quality.

A good standard makes the work easier to understand, repeat, observe, and improve.

It also helps reduce three common Lean problems:

- **Mura:** Unevenness in workload or production. - **Muri:** Overburden on people or equipment. - **Muda:** Activities that consume resources without creating value.

## 3 Steps to Level Workload and Stabilize Station Methods

### 1. Break Each Station into Individual Work Elements

Start by observing the actual work.

Instead of recording only one total cycle time, break the operation into smaller activities.

For example, a workstation with a 42-second cycle might contain:

| Work element | Time | |---|---:| | Pick component | 5 sec | | Position component | 6 sec | | Assemble component | 18 sec | | Inspect assembly | 7 sec | | Place finished unit | 6 sec | | **Total** | **42 sec** |

Classify each activity according to its contribution to value:

- **Value-Added (VA):** Activities that transform the product or service in a way the customer values. - **Necessary Non-Value-Added (NNVA):** Activities that do not directly add customer value but are currently necessary, such as certain handling or inspection activities. - **Non-Value-Added (NVA):** Activities that consume time and resources without adding value and should be investigated for elimination.

This breakdown makes it easier to understand where time is spent.

It also helps identify differences between operators. Are they performing the same sequence? Are tools positioned consistently? Are there unnecessary movements or waiting periods?

Observe several cycles and consider normal variation. One unusually fast or slow cycle should not become the basis for a new standard.

### 2. Visualize Workload Against Takt Time Using a Yamazumi Chart

Once the work elements are recorded, visualize the workload.

A Yamazumi chart stacks individual work elements into bars, allowing you to compare the total workload assigned to each operator or workstation.

Add a horizontal Takt Time reference line.

For example, assume customer demand requires a production pace of 60 seconds per unit.

| Operator | Total workload | Difference from Takt | |---|---:|---:| | Operator 1 | 48 sec | -12 sec | | Operator 2 | 71 sec | +11 sec | | Operator 3 | 55 sec | -5 sec | | Operator 4 | 62 sec | +2 sec |

The chart highlights that Operator 2 has a workload exceeding Takt Time.

However, this does not automatically mean Operator 2 is working inefficiently.

The workload may be unevenly distributed. Some activities may be suitable for redistribution, while others may be constrained by equipment, sequence, or skill requirements.

The purpose of the chart is to make these conditions visible so the team can investigate them.

### 3. Improve the Method Before Redistributing the Work

Before moving activities between operators, look for unnecessary work within each station.

Start with practical improvements:

- Move frequently used tools closer to the point of use. - Prepare materials before they are needed. - Reduce unnecessary walking and reaching. - Improve fixture and component positioning. - Eliminate repeated handling where possible. - Review whether inspection or movement activities can be simplified.

Then review whether suitable work elements can be redistributed across stations.

A balanced line should consider more than equal cycle times.

It should also account for:

- Operator safety and ergonomics. - Equipment and process constraints. - Work sequence and material flow. - Product quality requirements. - Normal cycle-time variation. - Differences in product models.

Once a practical method is established, document it using Standardized Work.

The standard should communicate the working sequence, required time, and relevant work-in-process conditions.

Most importantly, involve the people performing the work. They often understand practical difficulties that cannot be identified from a chart alone.

## Why Standardized Work Matters Across Different Shifts

A production line should not depend entirely on individual working habits.

When each shift develops its own method, it becomes difficult to understand whether differences in output come from the process, product mix, equipment, or working sequence.

Standardized Work creates a common reference.

It helps teams:

- Train new operators more consistently. - Identify abnormal conditions more easily. - Compare actual performance against the expected method. - Investigate differences between shifts. - Establish a baseline for continuous improvement.

Standardization does not mean that improvement stops.

When a better method is discovered and verified, the standard should be updated.

**Standardized Work is the starting point for improvement, not the end of it.**

## Build Your Yamazumi Chart with LLeanStore

Recording individual work elements and comparing operator workloads can become time-consuming when every chart is prepared manually.

LLeanStore's **Yamazumi Creator** helps practitioners organize work elements, record durations, categorize activities, and visualize workload distribution.

Use it to support:

- Work-element recording. - Operator and workstation workload comparison. - Value-added and non-value-added categorization. - Visual workload balancing. - Line-balancing discussions and improvement activities.

The application helps make workload differences easier to see. Actual method selection and balancing decisions still require observation, process knowledge, and validation at the Gemba.

Explore [Yamazumi Creator](https://www.lleanstore.com/apps/yamazumi).

*Part of LLeanStore's Editable Field Guide Series.*

## Frequently Asked Questions

**What is the purpose of workload balancing?**

Workload balancing aims to distribute work more appropriately across operators or workstations so the production process can meet customer demand while avoiding unnecessary waiting and overburden.

**What is the difference between Yamazumi and Standardized Work?**

Yamazumi visualizes how work elements and their durations are distributed across operators or workstations. Standardized Work defines the agreed working sequence and conditions for performing the process. They complement each other but serve different purposes.

**Should every operator have exactly the same cycle time?**

Not necessarily. The objective is to achieve a practical workload distribution that supports the required production pace. Equipment constraints, task requirements, ergonomics, and normal variation must also be considered.

**How does Takt Time help with line balancing?**

Takt Time represents the production pace required to meet customer demand. Comparing workstation workloads against Takt Time helps identify stations that may struggle to keep up with the required pace.

**Why do cycle times differ between shifts?**

Differences may come from working methods, material availability, equipment conditions, product mix, experience, fatigue, or other process factors. Observe the work before assuming the difference is caused by operator performance.

**When should Standardized Work be updated?**

Update it when an improved method has been tested and verified, when process conditions change, or when product and equipment requirements change. The standard should reflect the current approved way of working.

## Make the Method Consistent Before Expecting Consistent Results

When two operators perform the same job differently, the first question should not always be who works faster.

Look at the method.

Break the work into elements. Understand the time required. Visualize the workload. Remove unnecessary activities and establish a practical sequence with the people doing the work.

Then use the standard as a foundation for further improvement.

**Because consistent results begin with a process people can understand, follow, and improve.**