The process of switching a machine, line, or process from producing one product or configuration to another.

Definition

The process of switching a machine, line, or process from producing one product or configuration to another.

Practical Context & Application

Observe the full sequence from last good unit of the previous run to first good unit of the next run, and define the measurement convention.

Why It Matters (Purpose)

Changeover helps industrial engineers understand work content, method, capacity, or workload so the process can be designed to meet demand safely and consistently.

When to Use

Use Changeover when designing or reviewing a work method, workstation, operator allocation, time standard, or capacity plan using observed conditions.

When Not to Use

Do not use Changeover to justify unsafe pace, arbitrary labor reduction, or comparisons between different methods and conditions. Confirm safety, quality, skill, and process constraints first.

Shopfloor Example

An industrial engineer studies a two-person assembly cell where output varies between 520 and 570 pairs per shift. Using Changeover, the team observes the actual method, records work content and delays, and checks the proposed change with operators. Any revised method is trialled for safety, quality, workload, and repeatability before wider implementation.

LLeanStore Workflow Example

An IE observes the operation, records the relevant work elements or conditions, applies Changeover in the analysis, and uses the result to update standardized work or a Yamazumi/line-balancing review.

Common Mistakes to Avoid

Relying on unverified time data; ignoring ergonomic and quality requirements; using inconsistent measurement boundaries; and treating an analytical result as an instruction without shopfloor validation.

Ringkasan Bahasa Indonesia (Changeover)

Proses mengganti mesin, lini, atau operasi dari memproduksi satu produk atau konfigurasi ke produk atau konfigurasi berikutnya.

Konteks Praktis: Amati urutan lengkap sejak unit bagus terakhir dari proses sebelumnya hingga unit bagus pertama pada proses berikutnya, dan tetapkan aturan pengukurannya.

Contoh Lapangan: Seorang industrial engineer mempelajari sel perakitan dua orang yang output-nya bervariasi antara 520 hingga 570 pasang per shift. Dengan menggunakan Changeover, tim mengamati metode aktual, mencatat muatan kerja dan hambatan, lalu membahas usulan perubahan bersama operator. Setiap metode revisi diuji coba untuk keselamatan, kualitas, beban kerja, dan konsistensi hasil sebelum diterapkan lebih luas.

Alur Kerja LLeanStore: Seorang IE mengamati operasi secara langsung, mencatat elemen kerja atau kondisi terkait, menerapkan Changeover dalam analisis, dan memakai hasilnya untuk memperbarui kerja standar atau tinjauan Yamazumi/penyeimbangan lini.

Interactive Workbench: Apply Changeover directly inside our browser tool →

Related Lean Concepts

  • SMED — An abbreviation for Single-Minute Exchange of Die, a setup-reduction method that separates internal from external tasks and systematically reduces changeover time.
  • Setup Time — The elapsed time required to prepare a process, machine, or operation to produce a different product or perform a different task.
  • Dandori — A Japanese term used in manufacturing for preparation and setup work needed to change a process, machine, or line from one product or task to another.
  • Heijunka — The leveling of production type and quantity over a defined period to create a more consistent sequence and pace of work.