Lean Manufacturing Library · Lean Dictionary & Directory of Lean · 141 Concepts

Lean Manufacturing Library · Lean Dictionary & Directory of Lean (141 Concepts) — LLeanStore

LEI-aligned Lean Dictionary, Directory of Lean, and continuous improvement encyclopedia by LLeanStore: 141 Lean manufacturing definitions, formulas, practical contexts, shopfloor examples, and common mistakes across English and Bahasa Indonesia.

Lean Dictionary & Directory of Lean: Practical Definitions & Shopfloor Clarity

Every concept page in the LLeanStore Lean Manufacturing Library (our bilingual Lean Dictionary and Directory of Lean) pairs Toyota Production System and Industrial Engineering definitions with practical rules on when to use each method, when not to apply it, real manufacturing examples, and common mistakes—available in both English and Bahasa Indonesia.

Continuous Improvement & Problem Solving (18)

  • 4M Analysis — A structured way to examine potential process causes through four common categories: Man (people), Machine, Material, and Method.
  • 5 Whys — A questioning technique that explores cause-and-effect relationships by repeatedly asking why an observed problem or condition occurred. The number five is a prompt, not a fixed requirement.
  • 5M1E — A cause-analysis framework that groups potential causes into Man, Machine, Material, Method, Measurement, and Environment.
  • A3 Problem Solving — A structured way to develop and communicate problem-solving through a concise A3-sized report that connects the background, current condition, goal, cause analysis, countermeasures, implementation, and follow-up. The paper size supports concise thinking; A3 is not merely a form.
  • A3 Report — A concise, typically single-A3-page report that communicates the logic and progress of a problem-solving or improvement effort.
  • DMAIC — A structured Six Sigma improvement roadmap consisting of Define, Measure, Analyze, Improve, and Control.
  • Fishbone Diagram — A cause-and-effect diagram that organizes possible causes of a defined problem into categories to support structured investigation.
  • Improvement Kata — A practice routine for moving from a current condition toward a target condition through iterative experimentation and learning.
  • Jishuken — A focused, hands-on study and improvement activity in which managers and team members investigate an operating process at the gemba and develop capability through improvement work.
  • Kaikaku — A fundamental, often large-scale change to a process or operating system, in contrast to incremental improvement.
  • Kaizen — A way of working that engages people in ongoing improvement of processes, products, and services through observation, problem-solving, and changes to how work is done.
  • Kaizen Event — A time-bounded, team-based improvement activity focused on understanding and improving a defined process or problem.
  • Pareto Chart — A bar chart that ranks categories by frequency, cost, or another measure, often with a cumulative percentage line, to help identify the largest contributors.
  • PDCA Cycle — An iterative learning cycle: plan a change or test, do it, study the results against expectations, and act on what was learned by adopting, adapting, or abandoning the change.
  • Root Cause Analysis (RCA) — A structured investigation used to identify, test, and address the underlying causes that contribute to a problem, rather than only treating its visible symptoms.
  • Toyota Kata — A set of deliberate practice routines for developing scientific thinking: the Improvement Kata guides teams through direction, current condition, target condition, and experimentation; the Coaching Kata develops coaches who teach that pattern.
  • TWI Job Methods — A Training Within Industry method for improving how work is performed by breaking down a job, questioning details, developing a better method, and applying it.
  • Yokoten — The horizontal sharing and adaptation of proven learning, practices, and improvement results across teams, lines, or sites.

Industrial Engineering & Work Design (26)

  • Capacity Planning — The process of estimating and matching available resources and process capability with expected demand over a defined period.
  • Changeover — The process of switching a machine, line, or process from producing one product or configuration to another.
  • Cycle Time — The elapsed time required for a defined process or operator to complete one cycle of work. The start and end points must be stated so the measure is unambiguous.
  • Dandori — A Japanese term used in manufacturing for preparation and setup work needed to change a process, machine, or line from one product or task to another.
  • Ergonomics — The design of work, tools, equipment, and environments to fit human capabilities and limitations.
  • Karakuri — Low-cost mechanical automation using simple mechanisms such as gravity, springs, cams, or linkages to move materials or assist work with minimal or no powered actuation.
  • Line Balancing — The assignment and distribution of work among operators or stations to meet a required production pace while managing workload and constraints.
  • Makigami — A process-analysis method used particularly for administrative and information workflows to visualize activities, handoffs, documents, delays, and information flow.
  • Man-Machine Chart — A time-based chart showing the activities and idle periods of an operator and one or more machines during a defined cycle.
  • Method Study — The systematic recording and critical examination of how work is performed to develop a safer, simpler, and more effective method.
  • Motion Study — The systematic analysis of the movements used to perform a task to reduce unnecessary motion, improve ergonomics, and support an effective work method.
  • Operator Balance Chart — A chart that compares the work content assigned to operators or stations against a common time reference, often takt time, to reveal imbalance.
  • Process Mapping — A visual representation of the steps, decisions, handoffs, and sequence involved in a process.
  • Setup Time — The elapsed time required to prepare a process, machine, or operation to produce a different product or perform a different task.
  • Shojinka — The ability to adjust the number and allocation of workers in a process or line as demand changes while maintaining required output and quality.
  • SMED — An abbreviation for Single-Minute Exchange of Die, a setup-reduction method that separates internal from external tasks and systematically reduces changeover time.
  • Spaghetti Diagram — A layout-based diagram that traces the actual movement of people, materials, or information through a work area.
  • Standard Time — The allowed time for a qualified worker to perform a specified task using a defined method under stated conditions, including applicable allowances.
  • Standardized Work — The documented current best-known method for performing a repeatable task safely and consistently, commonly defining takt time, work sequence, and standard in-process stock.
  • Time Study — A work-measurement technique in which an analyst observes and times defined elements of a task to establish a time standard under specified conditions.
  • Work Combination Table — A chart that combines manual work time, walking time, and machine processing time to show the sequence and timing of work within an operator's cycle.
  • Work Element — A defined, observable part of a task or operation that can be described and measured as part of work analysis.
  • Work Measurement — The systematic application of techniques to determine the time required for a qualified person to complete a specified task using a defined method under stated conditions.
  • Work Sampling — A statistical technique that estimates how time is distributed among activities or states by taking observations at randomly or systematically selected moments.
  • Workstation Design — The arrangement of tools, materials, equipment, controls, and working space to support safe, effective, and repeatable work.
  • Yamazumi Chart — A stacked workload chart that displays the work elements assigned to each operator or station, commonly compared with takt time to reveal workload balance.

Lean Philosophy & Principles (11)

  • Basic Process Stability — A condition in which the key inputs and operating conditions of a process are sufficiently reliable and understood to support predictable work and further improvement.
  • Muda — Any activity that consumes resources without creating value from the customer's perspective. Some non-value-adding activity may currently be necessary; improvement seeks to reduce or eliminate it where possible.
  • Mura — Unevenness or inconsistency in demand, workload, or process operation that creates fluctuating work, queues, or resource use.
  • Muri — Overburdening people or equipment by demanding a level, pace, duration, or manner of work beyond what the system can sustainably support.
  • Non-Value-Added Activity — An activity that consumes time or resources without adding value from the customer's perspective. Some such activities may currently be required by safety, regulation, or process limitations.
  • Respect for People — A foundational Lean principle that recognizes people's dignity and capabilities and involves developing, supporting, and engaging them in improving work.
  • Toyota Production System (TPS) — The production system developed by Toyota, commonly described around Just-in-Time and Jidoka, supported by standardized work, continuous improvement, and respect for people.
  • Toyota Way — Toyota's management philosophy commonly expressed through two foundational principles: Continuous Improvement and Respect for People.
  • Value — The product or service attributes and outcomes that meet a customer's needs and for which the customer is willing to pay, as understood in the context of the value stream.
  • Value Stream — The complete set of activities, both value-creating and non-value-creating, required to bring a product or service from request through delivery.
  • Value-Added Activity — An activity that transforms a product or service in a way the customer needs and is willing to pay for, and that is performed correctly the first time.

Equipment & Maintenance (8)

  • Autonomous Maintenance — A TPM practice in which equipment operators take responsibility for defined routine care and inspection tasks, such as cleaning, lubrication, tightening, and abnormality detection.
  • Availability — The proportion of planned production time during which equipment is available to operate, according to the defined OEE calculation rules.
  • OEE — An abbreviation for Overall Equipment Effectiveness, a measure calculated from availability, performance, and quality factors for a defined equipment and time period.
  • Performance (OEE Factor) — The OEE factor comparing the equipment's actual operating rate with its ideal or design rate over operating time.
  • Planned Maintenance — Maintenance activities scheduled in advance to prevent failures, restore equipment condition, or manage deterioration based on time, usage, or condition.
  • Quality (OEE Factor) — The OEE factor representing the proportion of total output that meets quality requirements first time under the defined calculation method.
  • Six Big Losses — A common TPM framework that groups equipment effectiveness losses into breakdowns, setup and adjustment, minor stops, reduced speed, process defects, and startup losses.
  • Total Productive Maintenance (TPM) — A company-wide approach to improving equipment effectiveness by involving operators, maintenance specialists, and other functions in preventing losses and developing equipment-care capability.

Lean Management & Leadership (19)

  • Catchball — A two-way dialogue used during strategy deployment to exchange, challenge, and refine objectives, measures, plans, and resource needs between organizational levels.
  • Coaching Kata — A structured coaching routine used to develop another person's scientific thinking and problem-solving capability through questions and regular practice.
  • Daily Management — A routine system for aligning daily work with priorities, monitoring process conditions, making abnormalities visible, and responding to issues at the appropriate level.
  • Gemba — The actual place where value is created and work is performed; in manufacturing this is often the production floor, but it may also be a service, warehouse, or office process.
  • Gemba Walk — A purposeful visit to the place where work is performed to observe processes, ask questions, understand conditions, and support problem-solving.
  • Genchi Genbutsu — A principle of going to the actual place and examining actual conditions and facts firsthand before making judgments or deciding on countermeasures.
  • Hansei — A practice of deliberate reflection on what happened, what was expected, what was learned, and what should change next.
  • Hoshin Kanri — A strategy deployment process that translates an organization's direction and breakthrough objectives into aligned priorities, measures, and actions across levels through dialogue and review.
  • Leader Standard Work — A defined set of recurring management activities—such as gemba observation, process and safety checks, abnormality follow-up, and coaching—that helps leaders sustain standards and develop people.
  • Nemawashi — A process of preparing the ground for a decision by discussing a proposal with affected people, gathering input, and understanding concerns before formal approval.
  • Obeya — A visual management space, physical or digital, where a cross-functional team makes goals, plans, progress, issues, and decisions visible to coordinate work and solve problems.
  • Psychological Safety — A shared belief that people can raise questions, concerns, mistakes, and differing views without fear of humiliation or retaliation.
  • Sensei — A teacher or experienced practitioner who guides others in developing understanding and capability.
  • Skill Matrix — A visual record of the skills and qualification levels available across a team, used to identify training needs and staffing flexibility.
  • Training Within Industry (TWI) — A structured program for developing frontline supervisors and strengthening standardized work through practical methods. Its classic programs include Job Instruction, Job Methods, and Job Relations; some implementations also include Job Safety.
  • TWI Job Instruction — A Training Within Industry method for preparing workers, presenting the job, trying out performance, and following up so people can learn a task correctly.
  • TWI Job Relations — A Training Within Industry method for building supervisors' capability to maintain good working relationships and handle people-related situations consistently.
  • TWI Job Safety — A Training Within Industry program focused on helping supervisors identify hazards, prevent incidents, and integrate safety into daily work.
  • X-Matrix — A visual strategy deployment document that links long-term objectives, annual priorities, improvement strategies, measures, and accountable owners.

Material Flow & Logistics (6)

  • Material Presentation — The way materials are positioned, packaged, identified, and supplied at the point of use to support safe, reliable, and efficient work.
  • Milk Run — A scheduled route in which a vehicle makes a planned sequence of stops to collect or deliver materials between suppliers, stores, and/or points of use.
  • Mizusumashi — A material handler who follows a defined route and timing to replenish points of use, remove finished goods or empty containers, and support flow.
  • PFEP — An abbreviation for Plan for Every Part, a structured record of information needed to plan, replenish, store, handle, and deliver each part.
  • Plan for Every Part (PFEP) — A structured, maintained information record for each part used by a facility, containing the data needed to plan, replenish, store, handle, and deliver it reliably.
  • Supermarket — A controlled inventory location from which a downstream process withdraws what it needs and an upstream process replenishes what has been consumed.

Production Systems & Flow (28)

  • Batch Production — A production method in which a quantity of items is processed together at one or more steps before being transferred to the next step.
  • Bottleneck — A process step or resource whose effective capacity currently limits the throughput of the overall system.
  • Cellular Manufacturing — An approach that groups equipment and workstations to support the flow of a family of products through a compact process sequence.
  • Chaku-Chaku — A cell arrangement in which an operator moves from machine to machine, loading the next part as the previous machine automatically completes and ejects its process.
  • Constraint — A factor that limits the system's ability to achieve a higher level of performance or throughput. A constraint may be physical, procedural, material-related, or demand-related.
  • Continuous Flow — A way of arranging connected process steps so items move through the value-creating sequence with minimal interruption and small transfer quantities, ideally one piece at a time.
  • FIFO — An abbreviation for First In, First Out, a sequencing rule in which the first item entering a defined queue or buffer is the first item withdrawn.
  • FIFO Lane — A controlled buffer or lane designed to preserve first-in, first-out sequence between process steps.
  • Heijunka — The leveling of production type and quantity over a defined period to create a more consistent sequence and pace of work.
  • Heijunka Box — A visual scheduling device used to level the type and quantity of work released over time, often by displaying kanban cards in time intervals.
  • JIT — An abbreviation for Just-in-Time, the principle of providing what is needed, in the quantity needed, when it is needed.
  • Just-in-Time (JIT) — A production and delivery principle in which each process makes or provides what the next process needs, in the quantity needed and when needed. In the Toyota Production System, JIT is supported by takt time, continuous flow, and pull production, with heijunka providing an important foundation.
  • Kanban — A visual signal or control method that authorizes production or replenishment of a defined quantity when a downstream process consumes what it needs. Kanban helps connect processes in a pull system and control inventory or work in process.
  • Lead Time — The total elapsed time between defined start and end events for an item, order, or request, including processing and waiting within the stated scope.
  • Little's Law — A relationship for a stable system stating that average work-in-process equals average throughput rate multiplied by average flow time.
  • One-Piece Flow — A flow condition in which one unit moves from one process step to the next before another unit is transferred, rather than moving in large batches.
  • Pack-Out Quantity — The defined number of units grouped together for packaging, transfer, or replenishment in a process.
  • Pitch — The time interval corresponding to producing or withdrawing one defined pack-out quantity, commonly calculated as takt time multiplied by the number of units in the pack-out.
  • Production Leveling — The practice of distributing production volume and product mix more evenly over a defined time period rather than producing in large, uneven batches.
  • Pull Production — A production approach in which an upstream process makes or replenishes items in response to a signal or consumption from a downstream customer process.
  • Push Production — A production approach in which work is released according to a plan, forecast, or schedule rather than being directly triggered by downstream consumption.
  • Queue Time — The elapsed time an item waits before receiving the next process step or service.
  • Takt Time — The available production time in a defined period divided by the customer demand for that same period. Takt time expresses the pace at which a process must produce to meet demand (for example, minutes per unit); it is a planning reference, not the actual cycle time.
  • Throughput — The rate at which a system completes and delivers good units or work over a defined period.
  • Value Stream Mapping (VSM) — A method for visualizing the material and information flows required to deliver a product or service from request to delivery. A current-state map shows how the system actually operates; a future-state map designs a more effective flow and an implementation plan.
  • VSM — An abbreviation for Value Stream Mapping, a method for visualizing material and information flow across a value stream.
  • Work-in-Process (WIP) — Items that have entered a process but have not yet been completed as finished output within the defined system boundary.
  • Work-in-Process (WIP) Limit — A defined maximum quantity of work or inventory allowed within a process, buffer, or workflow stage. A WIP limit helps expose constraints and discourage overproduction; its effect on lead time depends on flow, throughput, and system conditions rather than the limit alone.

Quality & Process Control (22)

  • Automatic Line Stop — A mechanism or system that stops equipment or a production line automatically when a defined abnormality or unsafe condition is detected.
  • Common Cause Variation — The routine variation inherent in a process operating under its current system of conditions.
  • Control Chart — A time-ordered chart with a center line and statistically calculated control limits, used to study process behavior and identify signals that may indicate a change in the process.
  • Control Plan — A documented plan that identifies process controls, measurement methods, reaction plans, and responsibilities used to maintain product and process requirements.
  • Cp — A process capability index comparing the width of the specification range with the estimated natural process spread, without accounting for how well the process mean is centered.
  • Cpk — A process capability index that considers both process spread and the location of the process mean relative to the nearest specification limit.
  • Defect — A product or service characteristic that fails to meet a stated requirement or specification.
  • Defect Rate — A measure of the frequency of defective units or defects relative to a defined quantity of output or opportunities.
  • DPMO — Defects per million opportunities: a normalized measure of the number of defects relative to the total number of defect opportunities.
  • Failure Mode and Effects Analysis (FMEA) — A structured, proactive method for identifying potential failure modes, their effects and causes, and actions to reduce risk.
  • First Pass Yield (FPY) — The proportion of units that complete a defined process or sequence correctly the first time without scrap, rework, or repair.
  • FPY — An abbreviation for First Pass Yield, the proportion of units that pass a defined process correctly the first time without rework or repair.
  • Individuals and Moving Range (I-MR) Chart — A pair of control charts used to monitor individual observations over time and the moving ranges between consecutive observations, commonly when rational subgroups are not available.
  • Jidoka — A principle of building quality into the process by detecting an abnormality and stopping the process or signaling for immediate attention so defects are not passed forward and the cause can be addressed.
  • Poka-Yoke — A device, method, or process design that prevents a mistake or makes it immediately detectable so an error is less likely to become a defect.
  • Process Capability — The ability of a process, when stable and operating under defined conditions, to produce output within specification limits. Capability indices summarize the relationship between process variation and specifications.
  • Quality at the Source — The practice of making quality each person's responsibility at the point where work is performed, so abnormalities are detected and addressed before they are passed to the next process.
  • Six Sigma — A data-driven approach to improving process performance by reducing variation and defects through structured problem-solving methods such as DMAIC.
  • SPC — An abbreviation for Statistical Process Control, the use of statistical methods and time-ordered data to understand and monitor process behavior.
  • Special Cause Variation — Variation arising from a specific, identifiable change or unusual condition that is not part of the process's usual pattern.
  • Specification Limits — The upper and lower boundaries of acceptable product or process output defined by customer, design, regulatory, or other requirements.
  • Statistical Process Control (SPC) — The use of statistical methods and time-ordered process data to understand process behavior, monitor variation, and distinguish signals of special causes from routine common-cause variation.

Visual Management & Workplace Organization (3)

  • 5S — A five-step workplace-management practice—Sort, Set in Order, Shine, Standardize, and Sustain—that makes needed items visible and accessible, establishes routine care, and exposes abnormalities.
  • Andon — A visual and/or audible signal that communicates an abnormal condition or need for assistance at the point of work, enabling a timely response.
  • Visual Management — An approach that makes the status of work, standards, performance, and abnormalities visible at the point of use so people can understand conditions and respond appropriately.