A time-based chart showing the activities and idle periods of an operator and one or more machines during a defined cycle.
Definition
A time-based chart showing the activities and idle periods of an operator and one or more machines during a defined cycle.
Practical Context & Application
Use it to understand the relationship between manual work and automatic machine time, and to evaluate whether an operator can tend multiple machines safely and effectively.
Why It Matters (Purpose)
It creates a reliable baseline for training, workload analysis, capacity planning, and improvement. Without a defined method and measurement boundary, teams cannot make meaningful comparisons.
When to Use
Use when establishing or reviewing a repeatable work method, measuring work content, training operators, or investigating variation between actual and expected performance.
When Not to Use
Do not use time standards as a substitute for safe method design, or compare observations taken under different product, operator, machine, or process conditions without adjustment.
Shopfloor Example
An industrial engineer studies a two-person assembly cell where output varies between 520 and 570 pairs per shift. Using Man-Machine Chart, the team observes the actual method, records work content and delays, and checks the proposed change with operators. Any revised method is trialled for safety, quality, workload, and repeatability before wider implementation.
LLeanStore Workflow Example
An industrial engineer observes a workstation, breaks the task into clear work elements, validates the method and time observations, then updates the standardized work documentation and workload data used in the Yamazumi workflow.
Common Mistakes to Avoid
Timing an unstable or unsafe method; failing to define start and end points; using too few observations; ignoring allowances and operating conditions; and treating a standard as permanently fixed.
Ringkasan Bahasa Indonesia (Man-Machine Chart)
Bagan berbasis waktu yang menampilkan aktivitas dan waktu menganggur seorang operator beserta satu atau lebih mesin selama satu siklus tertentu.
Konteks Praktis: Gunakan untuk memahami hubungan antara kerja manual dan waktu proses mesin otomatis, serta menilai apakah satu operator dapat menangani lebih dari satu mesin secara aman dan efektif.
Contoh Lapangan: Seorang industrial engineer mempelajari sel perakitan dua orang yang output-nya bervariasi antara 520 hingga 570 pasang per shift. Dengan menggunakan Man-Machine Chart, tim mengamati metode aktual, mencatat muatan kerja dan hambatan, lalu membahas usulan perubahan bersama operator. Setiap metode revisi diuji coba untuk keselamatan, kualitas, beban kerja, dan konsistensi hasil sebelum diterapkan lebih luas.
Alur Kerja LLeanStore: Seorang industrial engineer mengamati suatu stasiun kerja, menguraikan tugas ke elemen kerja yang jelas, memvalidasi metode serta hasil pencatatan waktu, lalu memperbarui dokumen kerja standar dan data beban kerja pada alur Yamazumi.
Interactive Workbench: Apply Man-Machine Chart directly inside our browser tool →
Related Lean Concepts
- Chaku-Chaku — A cell arrangement in which an operator moves from machine to machine, loading the next part as the previous machine automatically completes and ejects its process.
- Work Combination Table — A chart that combines manual work time, walking time, and machine processing time to show the sequence and timing of work within an operator's cycle.
- Cycle Time — The elapsed time required for a defined process or operator to complete one cycle of work. The start and end points must be stated so the measure is unambiguous.
- Standardized Work — The documented current best-known method for performing a repeatable task safely and consistently, commonly defining takt time, work sequence, and standard in-process stock.