The time interval corresponding to producing or withdrawing one defined pack-out quantity, commonly calculated as takt time multiplied by the number of units in the pack-out.

Definition

The time interval corresponding to producing or withdrawing one defined pack-out quantity, commonly calculated as takt time multiplied by the number of units in the pack-out.

Formula

Pitch = Takt Time × pack-out quantity

Practical Context & Application

Use pitch to translate takt into a practical interval for production control, material handling, and monitoring.

Why It Matters (Purpose)

It helps control the release and replenishment of work so upstream processes respond to actual downstream consumption. This can reduce uncontrolled WIP, expose constraints, and make material flow more predictable.

When to Use

Use when the process has defined replenishment rules, reasonably stable consumption, clear ownership, and a way to respond to shortages or full buffers.

When Not to Use

Do not use it as a visual label without replenishment discipline, or to conceal unstable processes, chronic quality problems, unreliable supply, or unclear demand. FIFO and WIP controls need explicit capacity and escalation rules.

Shopfloor Example

A production line builds a queue of 180 semi-finished pieces before one operation, while downstream stations wait intermittently. The team uses Pitch to examine demand, process times, WIP, and the sequence of work. They trial a controlled change in flow or release rules and check throughput, lead time, and quality before expanding it.

LLeanStore Workflow Example

A downstream sewing line withdraws a standard container of components from a supermarket. The withdrawal signal triggers replenishment by the material handler on a defined milk-run route. The team tracks shortages and WIP against agreed limits in its production-control workflow.

Common Mistakes to Avoid

Setting quantities from guesswork; ignoring replenishment lead time and variability; allowing cards or signals to circulate without control; mixing FIFO and random access; and assuming a WIP cap alone guarantees shorter lead time.

Ringkasan Bahasa Indonesia (Pitch)

Interval waktu yang berkaitan dengan memproduksi atau mengambil satu pack-out quantity terdefinisi, umumnya dihitung dari takt time dikalikan jumlah unit dalam satu kemasan/wadah.

Rumus: Pitch = Takt Time × jumlah unit per kemasan (pack-out)

Konteks Praktis: Gunakan pitch untuk menerjemahkan takt time menjadi interval kerja praktis bagi pengendalian produksi, material handling, dan pemantauan.

Contoh Lapangan: Sebuah lini produksi membentuk antrean 180 unit setengah jadi sebelum satu operasi, sementara stasiun hilir menunggu secara berselang. Tim menggunakan Pitch untuk menelaah permintaan, waktu proses, WIP, dan urutan kerja. Mereka menguji perubahan terkendali pada aliran atau aturan pelepasan kerja dan memeriksa throughput, lead time, serta kualitas sebelum memperluasnya.

Alur Kerja LLeanStore: Lini jahit hilir mengambil satu wadah standar komponen dari supermarket. Sinyal pengambilan tersebut memicu pengisian ulang oleh petugas material melalui rute milk-run terdefinisi. Tim memantau kekurangan material dan WIP terhadap batas yang disepakati.

Interactive Workbench: Apply Pitch directly inside our browser tool →

Related Lean Concepts

  • Takt Time — The available production time in a defined period divided by the customer demand for that same period. Takt time expresses the pace at which a process must produce to meet demand (for example, minutes per unit); it is a planning reference, not the actual cycle time.
  • Kanban — A visual signal or control method that authorizes production or replenishment of a defined quantity when a downstream process consumes what it needs. Kanban helps connect processes in a pull system and control inventory or work in process.
  • Heijunka — The leveling of production type and quantity over a defined period to create a more consistent sequence and pace of work.
  • Pack-Out Quantity — The defined number of units grouped together for packaging, transfer, or replenishment in a process.