The total elapsed time between defined start and end events for an item, order, or request, including processing and waiting within the stated scope.
Definition
The total elapsed time between defined start and end events for an item, order, or request, including processing and waiting within the stated scope.
Practical Context & Application
Always define the start and end points before measuring or comparing lead time.
Why It Matters (Purpose)
Lead Time helps the team understand and control how work moves through the process, so flow, delivery, and inventory can be managed against actual demand.
When to Use
Use Lead Time when the process boundary, customer or downstream need, operating rules, and relevant data are clear enough to support a consistent decision.
When Not to Use
Do not apply Lead Time as a standalone fix for unstable methods, poor quality, unreliable supply, or unclear process ownership. Address those conditions and validate the operating assumptions first.
Shopfloor Example
A purchase order enters the material preparation process on Monday, waits two days for component availability, spends four hours in processing, and is released to the next section on Thursday. The team maps the full elapsed time—not just hands-on work—to see that waiting and queues account for most of the lead time.
LLeanStore Workflow Example
In a LLeanStore improvement workflow, the team observes the relevant production or material-flow process, records the baseline, applies Lead Time to the defined problem, and tracks the result through a PDCA action with an owner and review date.
Common Mistakes to Avoid
Applying Lead Time without defining scope or assumptions; using estimates instead of observed data; optimizing one station while worsening the overall flow; and failing to review the result after implementation.
Ringkasan Bahasa Indonesia (Lead Time)
Total waktu berlalu antara peristiwa mulai dan berakhir yang ditetapkan untuk suatu item, pesanan, atau permintaan—mencakup waktu proses sekaligus waktu tunggu dalam cakupan tersebut.
Konteks Praktis: Selalu tetapkan titik awal dan titik akhir sebelum mengukur atau membandingkan lead time.
Contoh Lapangan: Sebuah pesanan produksi masuk ke proses persiapan material pada hari Senin, menunggu dua hari demi ketersediaan komponen, menghabiskan empat jam pemrosesan, lalu dilepas ke bagian berikutnya pada hari Kamis. Tim memetakan seluruh waktu berlalu—bukan hanya waktu pengerjaan langsung—untuk melihat bahwa waktu tunggu dan antrean menyumbang porsi terbesar lead time.
Alur Kerja LLeanStore: Dalam alur perbaikan LLeanStore, tim mengamati proses produksi atau aliran material terkait, mencatat baseline, menerapkan Lead Time pada masalah yang dirumuskan, dan melacak hasilnya lewat rencana aksi PDCA lengkap dengan penanggung jawab dan tanggal tinjauan.
Interactive Workbench: Apply Lead Time directly inside our browser tool →
Related Lean Concepts
- Cycle Time — The elapsed time required for a defined process or operator to complete one cycle of work. The start and end points must be stated so the measure is unambiguous.
- Queue Time — The elapsed time an item waits before receiving the next process step or service.
- Work-in-Process (WIP) — Items that have entered a process but have not yet been completed as finished output within the defined system boundary.
- Little's Law — A relationship for a stable system stating that average work-in-process equals average throughput rate multiplied by average flow time.