Lean Manufacturing Library · Production Systems & Flow

Queue Time Definition & Practical Meaning | LLeanStore

The elapsed time an item waits before receiving the next process step or service.

Definition

The elapsed time an item waits before receiving the next process step or service.

Practical Context & Application

Measure it separately where possible to understand how much lead time is spent waiting rather than being processed.

Why It Matters (Purpose)

Queue Time helps the team understand and control how work moves through the process, so flow, delivery, and inventory can be managed against actual demand.

When to Use

Use Queue Time when the process boundary, customer or downstream need, operating rules, and relevant data are clear enough to support a consistent decision.

When Not to Use

Do not apply Queue Time as a standalone fix for unstable methods, poor quality, unreliable supply, or unclear process ownership. Address those conditions and validate the operating assumptions first.

Shopfloor Example

A production line builds a queue of 180 semi-finished pieces before one operation, while downstream stations wait intermittently. The team uses Queue Time to examine demand, process times, WIP, and the sequence of work. They trial a controlled change in flow or release rules and check throughput, lead time, and quality before expanding it.

LLeanStore Workflow Example

In a LLeanStore improvement workflow, the team observes the relevant production or material-flow process, records the baseline, applies Queue Time to the defined problem, and tracks the result through a PDCA action with an owner and review date.

Common Mistakes to Avoid

Applying Queue Time without defining scope or assumptions; using estimates instead of observed data; optimizing one station while worsening the overall flow; and failing to review the result after implementation.

Ringkasan Bahasa Indonesia (Queue Time)

Waktu berlalu saat suatu item menunggu sebelum menerima langkah proses atau layanan berikutnya.

Konteks Praktis: Ukur secara terpisah bila memungkinkan guna mengetahui porsi lead time yang dihabiskan untuk menunggu dibandingkan waktu pemrosesan.

Contoh Lapangan: Sebuah lini produksi membentuk antrean 180 unit setengah jadi sebelum satu operasi, sementara stasiun hilir menunggu secara berselang. Tim menggunakan Queue Time untuk menelaah permintaan, waktu proses, WIP, dan urutan kerja. Mereka menguji perubahan terkendali pada aliran atau aturan pelepasan kerja dan memeriksa throughput, lead time, serta kualitas sebelum memperluasnya.

Alur Kerja LLeanStore: Dalam alur perbaikan LLeanStore, tim mengamati proses produksi atau aliran material terkait, mencatat baseline, menerapkan Queue Time pada masalah yang dirumuskan, dan melacak hasilnya lewat rencana aksi PDCA lengkap dengan penanggung jawab dan tanggal tinjauan.

Interactive Workbench: Apply Queue Time directly inside our browser tool →

Related Lean Concepts

  • Lead Time — The total elapsed time between defined start and end events for an item, order, or request, including processing and waiting within the stated scope.
  • Work-in-Process (WIP) — Items that have entered a process but have not yet been completed as finished output within the defined system boundary.
  • Little's Law — A relationship for a stable system stating that average work-in-process equals average throughput rate multiplied by average flow time.
  • Bottleneck — A process step or resource whose effective capacity currently limits the throughput of the overall system.